As the production arm of Olagoon LLC, olagoon's Qingdao Operation Team controls every stage of production — from the arrival of raw PVC and fiberglass materials to the final pre-delivery inspection of the finished pool. Our manufacturing facility in the Qingdao Economic Development Zone spans 12,000 square metres and houses dedicated workshops for PVC cutting, tube heat sealing, FRP mould fabrication, pool digital printing, final assembly, and quality testing.

By integrating design, engineering, prototyping, manufacturing, and testing under one roof, we eliminate the inefficiencies of contract manufacturing and maintain direct control over build quality, material selection, and delivery timelines. Every pool that leaves our workshop is built by our people, on our equipment, to our standards.

12,000 m² Manufacturing floor
200+ Skilled workers
15,000+ pools produced annually
ISO 9001 Quality certified

Factory Intelligence

Explore Our Manufacturing Capabilities

C

Production Capacity

12,000 m² facility producing 15,000+ pools/yr across pools and safety equipment lines. 200+ workers, 2 shifts.

MOQ
Samples 5–10 · Bulk 50+
Lead Time
12–16 weeks (bulk)
Full capacity details →
Q

Quality Lab & Testing

Independent QC lab with 4 testing stages: raw material inspection (tensile, tear, UV), 24–48h pressure hold at 1.25x rated pressure on every pool, load/balance verification, and seam peel strength testing by batch sampling every 50 units (ASTM D751).

Lab Equipment
Tensile tester, temp chamber, leak tank
Standards
ISO 9001, CE, AS 1799
Lab procedures & equipment →
O

OEM/ODM Capability

End-to-end OEM/ODM services: custom mould design, private-label packaging, custom pool colors, deck graphics (digital & screen printing), and drop-ship logistics.

Certifications
ISO 9001, BSCI, CE, REACH
Shipping
FOB, CIF, DDP to 50+ countries
Full OEM services →

Workshops

Manufacturing Workshops

PVC Cutting & Material Preparation

Automatic CNC cutting machines process PVC and drop-stitch fabrics with sub-millimetre precision. Computer-optimised nesting minimises material waste and ensures every panel meets its dimensional specification before welding.

PVC Cutting & Material Preparation

Tube Welding & Heat Sealing

Dedicated welding workshop with heat sealing machines and RF dielectric presses. Hot-air heat sealers bond and fuse PVC tube chambers, while RF welds produce high-strength airtight seams that exceed EN ISO 25649 requirements.

Tube Welding & Heat Sealing

FRP Moulds & Composite Fabrication

Custom FRP moulds for pool components, produced using hand-lay-up fiberglass moulding with polyester and vinylester resin systems. Each layer is hand-rolled and vacuum-bagged for consistent quality. Gelcoat spray booth provides a high-gloss, UV-resistant marine finish.

FRP Moulds & Composite Fabrication

pool Printing & Decoration

pools are decorated using digital printing for full-colour graphics and screen printing for logos and repeating patterns. Digital printers produce photo-quality deck designs, while screen printing delivers durable, vivid brand marks.

pool Printing & Decoration

Final Assembly & Rigging

Assembly line where drop-stitch cores are finished with rails, wall surfaces are applied, and valves, fittings, and accessories are installed. Each pool follows a 100-point assembly checklist signed off by the team lead.

Final Assembly & Rigging

Quality Testing & Inspection

Every completed pool undergoes mandatory air-retention testing and a full systems check before shipping, with seam peel strength verified by batch sampling every 50 units. Our quality lab operates independently from production and reports directly to management.

Quality Testing & Inspection

B2B informacije

Proizvodni i trgovački uvjeti

OLagoon je brend kojim upravlja Olagoon LLC (SAD) — ISO i CE certificiran, s 10+ godina izvoznog iskustva.

MOQ

Samples from 5–10 units. Standard production MOQ: 50 units per model.

Vrijeme isporuke

Standardna proizvodnja: 30-45 dana od potvrde narudžbe. Vrijeme izrade uzorka/prototipa: 15-20 dana. Hitne narudžbe dostupne.

Uvjeti plaćanja

T/T 30% avans, 70% prije otpreme. L/C, Western Union i PayPal dostupni za kvalificirane partnere. Rokovi plaćanja po dogovoru.

Dostava i logistika

FOB Qingdao, CIF, DDP dostupni. Interni tim za teret upravlja utovarom kontejnera, dokumentacijom i carinskim formalnostima za glatku dostavu diljem svijeta.

Certifikati

ISO upravljanje kvalitetom. CE (EU) certifikat na svim standardnim modelima. FCC/UKCA/FDA na zahtjev. Izvješća o reviziji tvornice dostupna su.

Osiguranje kvalitete

100% ispitivanje zadržavanja zraka na svakom komadu. Čvrstoća šavova na ljuštenje provjerava se uzorkovanjem serija svakih 50 komada (ASTM D751). 3-godišnja garancija na proizvodne greške. Inspekcija treće strane (SGS/BV) prihvaća se prije otpreme.

Equipment

Key Manufacturing Equipment

Automatic PVC Cutting Machine CNC-controlled, 0.1 mm accuracy
Heat Sealing Machine Hot-air, 200–300 °C, for tube bonding
RF Dielectric Welding Press 15 kW, airtight seam welding
Fiberglass Hand-Lay-Up Moulds pools moulds up to 14 ft
Digital Printer Full-colour pool deck graphics
Screen Printing Machine Multi-colour logo printing

Production Flow

From Material to Finished Pool

Every pool passes through 6 production stages with QC checkpoints at every step. No shortcuts, no skipped inspections.

01

Material Receiving & Incoming QC

All incoming materials are logged by batch/lot number in our ERP system. PVC fabric rolls, drop-stitch cores, valves, adhesives, and hardware are quarantined until QC sign-off.

QC Checkpoint

Tensile strength (ASTM D751), tear resistance (ISO 4674), thickness gauge, adhesive viscosity, visual defect scan

Pass / Fail Threshold

100% of batches tested. Reject if tensile < 90% of spec, tear < spec min, or any visual defect

02

CNC Cutting & Material Prep

Computer-optimized nesting lays out panels on PVC stock to minimize waste. Automatic CNC cutting machines maintain 0.1 mm positional accuracy.

QC Checkpoint

Dimensional check against CAD DXF files, edge quality inspection, panel count verification

Pass / Fail Threshold

Every 20th panel measured. Tolerance ±0.5 mm. Reject batch if >2% out of tolerance

03

Welding & Drop-Stitch Bonding

Drop-stitch cores are bonded to outer PVC laminates using heat lamination. Tube chambers are RF-welded or hot-air welded. Rail bands are triple-layer fusion bonded.

QC Checkpoint

Peel test every 50 units (ASTM D751), weld width measurement, hot-air temperature log review, visual seam inspection under backlight

Pass / Fail Threshold

Peel strength min 8 N/cm. Weld width tolerance ±1 mm. Any visible channeling = reject

04

Assembly & Rigging

Pools move to final assembly where all components are mated: rails glued and welded, valves installed, D-rings, handles, drain ports, and carry bag fitting. Each unit follows a 100-point assembly checklist.

QC Checkpoint

100-point checklist sign-off per unit, valve function test (10 open/close cycles), hardware torque verification, visual inspection

Pass / Fail Threshold

Zero-defect policy on safety-critical items (valves, D-rings, handles). Minor cosmetic: AQL 2.5 (ISO 2859)

05

Pressure Testing & Quality Hold

Every chamber is inflated to 1.25× rated pressure (typically 20–25 PSI) and held for 24–48 hours. Pressure sensors log continuously. Chambers exceeding 5% pressure drop are rejected and sent for seam re-inspection.

QC Checkpoint

24–48h pressure hold log, sensor calibration verified daily, temperature-compensated pressure reading, seam re-test after repair

Pass / Fail Threshold

Max 5% pressure drop over 24–48h at stable temp. Any chamber exceeding this = 100% re-test of entire production batch

06

Final Inspection & Packing

Final visual and functional inspection. Surface defects, color consistency, label/BIN verification, packaging integrity, and accessory completeness. Units are vacuum-packed, boxed, and palletized for container loading.

QC Checkpoint

Full visual inspection, accessory checklist per SKU, packaging drop test (1 m, random sample), label/bar code scan verification

Pass / Fail Threshold

AQL 2.5 for major defects, AQL 4.0 for minor. Zero tolerance on safety defects. 100% of units visually inspected

Our People

Workforce & Expertise

Engineers across R&D, mold design, materials lab, and production engineering. Average 7+ years in inflatable manufacturing.

25+

R&D & Engineering

Product design, mold engineering, materials lab

15

Cutting & Material Prep

CNC cutting, panel preparation, material handling

40

Welding & Lamination

RF welding, hot-air welding, drop-stitch bonding

30

pool Core Bonding

Drop-stitch lamination, heat bonding, rail band fusion

35

Assembly & Rigging

Final assembly, hardware installation, systems check

12

Quality Control

Incoming QC, in-process QC, final inspection, lab testing

20

Logistics & Packing

Packaging, container loading, export documentation

15

Management & Admin

Sales, procurement, HR, finance, compliance

QC by the Numbers

Quality Control Metrics

Real pass/fail data from our production line. Our quality lab operates independently from production and reports directly to management.

100%
Units pressure-tested

Every pool, every chamber, every batch

<5%
Max allowable pressure drop

Over 24–48h at 1.25× rated pressure

AQL 2.5
Major defect threshold

Per ISO 2859 sampling standard

24–48h
Pressure hold duration

Depending on product category

1.25×
Test pressure vs rated

Safety margin on every chamber

0%
Tolerance on safety defects

Valves, D-rings, seams, buoyancy

Traceability

Material Tracking & Batch Control

Every batch of raw material is assigned a unique lot number in our ERP system. From arrival through production to the finished product, each pool's bill of materials links back to the original supplier batch. This enables full upstream traceability for any quality or compliance inquiry.

Tracking system Custom ERP (Qingdao Vatrad Group internal system) + physical batch tags on each work order
Coverage 100% of production materials — PVC, drop-stitch fabric, adhesives, valves, hardware, packaging
Records retained 10 years (per CE 2013/53/EU requirement)

Supplier Material Certifications

Marine-grade PVC
Chinese and Korean suppliers
ISO 9001, REACH, RoHS
Drop-stitch fabric
In-house weaving + external partner
Internal QC + supplier ISO 9001
Valves & Hardware
Chinese OEM suppliers
ISO 9001, material certs per batch

See our manufacturing process

Follow a pool through every stage of production — from raw material to backyard-ready pool.

View production process →
WhatsApp Nabavi ponudu